Climb a bottom to did not close in time, also did not adopt preventive measure
Flank of layer station platform defends, without skirting board
Establish muscle personnel faces edge task, without safe preventive measure
Elevator platform defends the door was not installed, did not adopt temporarily preventive measure
Without practical distribution box, not " one machine leaks "
2 times the structure is hanged raise work platform non-standard, without special program
Construction nacelle is fixed, not practical before bracket (put in the balcony to turn over bank to go up)
2 times the structure works, exercise foot hand board, defend non-standard, hidden trouble is big
Steel bar processing machinery, PE protection route did not receive mechanical equipment repeatedly (there are 3 lines only in the graph)
Tower crane wire rope is lacked prevent skip plant
Core of wire rope rope is squeezed piece, discard as useless
Elevator well platform, lack defend the door
Combustible material was not deposited technically, fire control hidden trouble is big
Discharge platform adds a rope to was not pulled straight
Tower crane top rises oil cylinder pressure to was not released
Temporarily passageway laid is unqualified
Steel bar processing machinery, did not defend canopy
Fireplug attaint, without water
Jumper of PE of door of distribution case case, without join
When aerobic acetylene is used, deposit without departure, without damping circle
Mouth scaffold, be maintained without horizontal syncline and connect a wall
Pattern plate support exists lever to do not have exert oneself dot, mouth of a cave did not defend
Tower hook head is sure to lack
Pattern plate bracket and scaffold join
Distribution box does not have box door, wiring disorder
Face frontier defence to protect lack
Withered grass has hidden trouble of greater fire protection
Seeper of tower crane foundation
2 times structural phase is lacked face frontier defence to protect
Fireplug is hydraulic and insufficient
Reinforcing steel bar machines equipment to do not have join PE line
Transformer issues a large number of piling up to be able to light tinderbox
Scaffold rubbish piles up
Tower crane gives ground library roof, without stage of shut-off of water
Electrical wiring pulls ground bubble water
Platform of be born discharge did not defend
Nacelle is inserted ahead of schedule, steel tube of wire rope attrition
Fire control connects corridor 2 times structural phase defends restore not seasonable
Promotion machine stays layer device damage
Switch box is proximate scaffold, across works, the position is improper
Temporarily the passageway is built set optional, lack defend
Short on pull scaffold, before pull rod, do not have next propping up
Lack between scaffold and main body defend between the layer
Lack between scaffold and main body defend between the layer
Pattern plate support exists lever freedom to carry height to exceed bid
Climb a pull rod, bearing pin does not have split pin
Dangerous carry scaffold double nut to did not tighten solid, i-steel flank lacks close solid stopper
Discharge platform is lacked defend
Tower crane is decreased deserve to weigh, empty did not defend
Bearing pin of tower crane big arm does not have split pin
Climb an anticreep of dynamoelectric calabash link up with to hook attaint
Advocate wire rope is lacked prevent skip, discharge stringy annulus not to act well
Be worn outside and lack between main body defend
Scaffold establishs lever foundation to did not fall on I-steel
Elevator adds wall inclined pull rod to do not have installation
Ministry of discharge platform end defends height is insufficient