Roofing project is to build one of 10 big branch, content is not much, project amount is not large also, but also however although spadger is small completely of the five internal organs, and the place that is the serious hidden danger when after sequel reachs a floor, living. Leakage water is the biggest question, and this also is roofing project the trivallest the place that is worth to had been done most. And the impermeability that the construction quality of roofing decided roofing and wear. This is the place that construction just headaches, it is construction the place of square deficient money. Changjiang Delta area, guangdong area is more crucial, monsoon comes, rain heavily outside, the phenomenon of sprinkle also is to have inside happen. With a few pieces the plan says those things with slack roofing below! The welcome leaves a message compensatory, discuss communication together!
One, problem allegation1, parapet did not do plasterer, general situation parapet is the wall outside following same, use waterproof mortar to undertake plasterer, the screw hole before including plasterer is sealed did not finish.
2, parapet did not do flashing, general situation is according to atlas standard construction does flashing, prevent rainwater to coil down metope inpour between material and structure in aperture and cause slack.
This is common phenomenon, because above covered stone capable person, keep out lived, not be to cause slack cause, but this affirmation is the jerry behavior in construction process.
3, waterproof a material quality, include to coil height is returned on material enough, burn a store stickup quality how, whether does add layer apply shade part circular arc, build receive width whether enough, roll the material function of material, classics examination is unqualified, height is returned on insufficient, shop sticks quality to differ a part to fall off at the beginning, material performance is poor also, be able to bear or endure sufficient demand of the dissatisfaction that await a gender, the time of a few months has begun ability ageing, although do not leak now, the circumstance after how assuring one year again?
4, concrete of facing fine stone did not set space to seam, cause packing too tall and conserve does not reach the designated position again bring about facing to already all contracted craze, reseau of reinforcing steel bar piece also be done not have or install at will, such both neither can organize catchment, to waterproof protection also is not to reach the designated position, quickened waterproof an ageing of material.
5, floor seeper. The roofing below normal circumstance can be set look for slope, have constituent drain off water, install gutter and cent waterline, but here also is done not have, and without make level, do not reach the designated position even what side is discharged or bottom platoon also does, the likelihood is slack a bottle of elevation mistake or other reason, cause roofing seeper, increased the possibility of leakage water thereby.
2, control precaution1, structure: The most important one step, strive to achieve a structure from waterproof, grab from the structure, the process is controlled, control the quality of good concrete, compare from the water ash of fountainhead, when carrying, grow when construction process is irrigated mediumly build mass packing, forbidden the seasonable conserve after adding water to construction.
Give roofing structure to turn over cage to should be irrigated additionally build, cannot hind irrigate bring about occurrence construction to seam.
Like floor drain these must mouth of a cave must make good condole hole, a lot of slack leak from here namely go down.
Do good flashing, roofing to look for slope and cent waterline, accomplish have constituent drain off water, not seeper.
Do test of good store water in time after structural construction ends like roofing, toilet, balcony, make good record, seasonable discovery is rectified and reform in time, be like low pressure commonly usedly to note an oar, common says to give or take an injection, not when from the back ability discovery, when arriving, polluted decorate a loss more big.
2, waterproof: The structure is inadequate, waterproof come collect. A common capable person, coating is waterproof, resemble a capable person these quality that basically see construction, add layer, build receive width, stickup quality, on return etc, and considering wear, roll the property of material data also is crucial place, it is now more very do not leak, do not give data a few years one ageing begins slack, the toilet of a lot of buildings exists namely such problem, truth be exactly the same.
3, author aspirationsReal-estate industry much teenager, had reported on news magazine, the problem of truly safe respect is done not have basically, but slack this one problem emerges in endlessly, it is the germ of a lot of problems, it is contradictory base point, owner follows development business make trouble, owner disputes over trifles with property, superstratum owner follows lower level owner, issue looks etc with respect to whole construction industry, do not have better settlement this one problem, be patch up concealments nevertheless, see less than stopping.
Just about such, everybody got chance, although satisfied the basic requirement of security, however the certain share that oversight dropped comfortable sex, wear is more via living test, take waterproof belong to the same organization for, waterproof roll material is protected basically qualitative a few years, good probably longer, via having time test, the test of material ageing, later how bad to said, everybody dare assure. Regard a project as the person, should accomplish from exert oneself, strict requirement on one hand oneself should strengthen a process to control, hold construction details, normative construction project, pay attention to construction quality, the owner that after giving, lives is explained, accomplish at the same time difference changes surely, occupied answer surely, had had surely investigate. Magnanimous work, be an upright person with clean hands!