2008 global finance seismic sea wave, just start at that time the Vietnam of development is in also be immersed in a few years ever since among them, among them a lot of in those days the Vietnam business that high speed expands appears capital catenary ruptures problem, the high buildings and large mansions inside a lot of Vietnam rivers is sodden also end up to now. Vietnam is regarded as the pet of world capital now, economy grows quickly, estate is very fervent also, but look at a lot of this sodden end inside the river high buildings and large mansions, the compatriots that invests Vietnam probably wants reason a bit. The graph is the head office of the biggest cement of Vietnam of sodden end edifice inside the river the mid edifice that jump over mud. Start working Apex Tower was the famous sodden poop deck inside the river 2008, this building completes the construction of 70% , but problem of this project financing must pause 2011. After was checked 2014 this project shows construction design is unreasonable again. To 2016, because involve the issue such as defer consign, ruling of court of the people inside the river builds square reparations, but just do not have money as a result of the building, this project is in sodden end phase all the time. This edifice that jump over mud builds locate 2011, this project is built by class A office building, area 8476 square metre, include 31 tall buildings and 4 cellar, total floor area is made an appointment with 78, 270 square metre, can hold 200 firms office. The initiative investment amount of this project is aegis of 195.2 billion Vietnam. After predicting to will be in 3 years originally, finish, but so far, the project just completes main body construction, investor must remit to of will finishing time 2017 the 3rd quarter, but the condition that still is in sodden end up to now. Edifice of Vietnam labour travel is construction becomes Vietnam originally the headquarters of industrial and commercial bank, at was on October 20, 2010 inside the river west lake county held foundation stone laying ceremony, predict originally will 2014 finishing, but project arrives 2014 with respect to shutdown, this project total investment is as high as 400 million dollar, build double tower, two tower mix 68 for 48 respectively. The edifice of Vietnam labour travel that the graph is sodden end. Vietnam is industrial and commercial bank of bank share-holding system is one of banks with current the biggest Vietnam, face headquarters building to rot end is opposite actively project of this headquarters building undertakes recombining a plan. Because shutdown is old, a lot of infrastructure already began to appear degrade evidence. HUD Tower project is by HUD company investment is built, total investment is aegis of 2 trillion Vietnam. Start working construction still does not have construction nearly 10 years to finish, at present this project prepares to rebuild for the hotel. These sodden poop deck are basic it is capital ruptures, also be child of Vietnam economy foamy. | | |