Building a house is hundred years great undertaking, everybody does not think Fu Zhidong sheds his painstaking effort, so a lot of people think the house with the capacity built-in and best limits in oneself, the light steel that appears to these a few years suddenly is villatic, a lot of people itch to try however in fear and trembling, light steel building and bowl building that is good, which price compares be to one's profit, we look together.
Above all the position that the contrast of the price wants to stand in opposite equality. Mix as villatic as light steel contrast to basically be based on the following respect to think with respect to the brick
Be based on an area
Light steel villa is mixed than the brick because of wall body should thin (inside wall 12cm) , same floor area is mixed than the brick want many 8% to 15% , the valuation area that at the same time the brick mixes (water of drop of hut face, eave, gazebo) should compare light steel villa big 10% above. Build place of a coequal usable floor area to need to be used cover an area of an area smaller.
Be based on modelling
The modelling of light steel villa is richer, do not exceed 6 meters circumstance to finish model of OK and aleatoric design in span, it is very difficult to can build traditional brick to mix build the exterior model that cannot build even, in achieve the cost that the brick mixes under similar modelling result to want to cost bigger cost, take so 44 just do not have modelling common brick of simple perhaps formative mixes a building to compare modelling the villa of complex exterior individual character will compare is to have those who break fairness, this is just like slimy brick house to be taken mixing a room with brick of red brick room is same argument quite. Oneself demand must determine before be being compared so, be to want only be a house? Be still pair of formative demand? Be still the demand with moderate easy?
Be based on the time cost of owner
Traditional brick is mixed build cycle from begin to prepare to build a room to rise, time at least wants 6 months to come 1 year above is longer even, add environmental protection is severe nowadays below the big context that grasp, in preparatory process not only face traditional material to rise in price, give existing money to also buy the situation that is less than red brick or other data even; And choose light steel villa, room process is built to need the most quickly 30 days only after foundation gets ready, be in after signing a contract to be designed certainly can all things no matter, carefree hit card games all the day, go out to play circuit to travel the house has been built, need not mix all things that builds a house to worry about like traditional brick, All matters, work from dawn to night, the cost of time of half an year that comes out to be being saved for the individual boss of outer business achieves half more possibly even the price of villa of a light steel
Be based on semifinished product configuration
The semifinished product definition of light steel villa is window of the branch outside the building the wall outside total package, all sides is decorated completely, room 6 level pay (leave out basic level processes charge)
Be based on building correlated characteristics
One. Security PK
Earthquake
Seismic itself does not injure a person, injury person is real it is the not aseismatic building collapse that the earthquake causes injures a person. Face the happening of these a few years of frequent earthquakes, the country takes the reform of the building seriously, traditional tile structure already was popularized by the country no longer, the building of light steel structure that assembles type already replaced traditional building stage by stage.
2. Security PK
Typhoon
The typhoon is a giant energy warehouse, its wind speed is in 17 meters / second above, be in 60 meters even / second above, one with 100 meters / the typhoon that second speed advances, force of leeway of susceptive of building of tradition of every square metre 2.5 tons, the building is caused to damage badly in the meeting below so big wind-force. Collapse! Professional light steel building uses main body of advanced double-faced galvanization light steel and entrance OSB board is formed " board help structural system " the building is firm, light steel main body is antirust and moth-proofing, apply to aseismatic intensity 9 class area, can bear the basic snow of 1.55KN/ square is pressed, can resist 13 class hurricane!
3. Security PK
Geological calamity
Geological calamity area mixes weight as a result of the brick overweight cause foundation to sink cause building collapse, but light steel building is self-prossessed light, mix structural building for the brick only 1/5 the left and right sides, reinforcing steel bar mixes clay structure building 1/8 the left and right sides, reduce foundation greatly thereby bearing reduce foundation to sink.
4. Security PK
Craze
The brick mixes building craze to happen from time to tome, maintenance do poorly done work over again costs arduous influence to live, villa of a light steel is comprised by more than 10000 component, and component part performance is steady, definition is high, integral structure is whole, not easy craze.
5. Comfortable sex PK
Damp
The brick mixes building moisture, live for a long time very great to human body body harm.
6. Sound insulation, adiabatic heat preservation
Sound insulation
National level sound insulation is 40 decibel, but traditional house is major short of this standard. Sound insulation effect is poor, affect life quality badly! General light steel building by light steel keel. Insulation material is mixed the compound wall body that structural board forms. Sound insulation effect can be as high as 60 decibel, enjoy high quality living life easily!
Adiabatic heat preservation
The brick mixes effect of room material heat insolation to differ summer to heat up / cold in the winter. Major roof increases half to use heat insolation, raised cost again at the same time, light steel building is complex wall body leaves fiber cotton and crowded model warming plate to be united in wedlock by Bo, prevented wall system " Leng Qiao " phenomenon, body of 15cm combination wall is equivalent to brick wall 1 meter heat preservation effect.
Be based on policy to give aid to
Live build a ministry to be in " " 935 " assemble type to build action program " in, put forward to arrive 2020, the whole nation assembles type construction to occupy build architectural scale to achieve 15% above, advance an area to achieve 20% above mainly among them, advance an area actively to achieve 15% above, encourage advance an area to achieve 10% above, 31 province city of countrywide came on stage to assemble type to build a target to reach in succession relevant give aid to policy.
Be based on after service
Traditional brick is mixed normally owner looks for a construction group to build the building after finishing to do not have any guaranteeing to safeguard, the quality that perhaps provides period of time to partial data only assures; But general light steel passes owner of the consign after checking and accept villaticly to use began to enjoy main body 50 years to guarantee freely that day, lifelong material price defends a service after 50 years, decorate adornment (damage like nature of metope of slack, craze, roofing) guarantee 5 years, guarantee period this price safeguards epigenesis the safeguard after waiting for carry out, after the phone after dialing carry out can receive inside 24 hours guarantee arrangement is passed on, let owner set his mind at to live lifelong without care.
Be based on a trend
Brick house of room of house of cogongrass of course of industry of Chinese civilian house, board, mud, red brick house, mix clay room to arrive again the light steel building nowadays, this is the inevitable tendency that civilian house industry grows, add the national attention to environmental protection (tile plant shuts stop, river sand is restricted to scoop up, traditional structure examines and approve limitation, it is easier that new-style building is examined and approve) , to new-style green architectural guiding and requirement (countrywide each district promulgated new-style building to be in in succession 2017 build a building to be occupied mediumly than rigid index, bring into a place to assess) , traditional brick mixes architectural because integrated cost is in district reason, price of labor cost, material waits each respect a moment to be put in certain difference, at the same time the tradition proposes room budget normally cannot accurate, often be to build the budget before building a house with heel to differ very far, and the cost of light steel villa can ensure to won't overspend in the process that build a house through relatively accurate budget;
The place on put together is narrated, although skip of other side think, be based on valuation area and semifinished product configuration only for two respects, the brick mixes the rate of rate of exchange with structure and the relatively reasonable cost with light villatic steel structure to answer with 1: 0.85 the left and right sides is relatively appropriate and reasonable, so integrated for the brick is mixed reach cost of light steel structure to be about the same, from long-term go up in light of, building light steel villa is an investment, the value of these investment can reflect the square respect range in the life, but it is invisible, the integrated cost that so a lot of moment say light steel building is low not without the truth, everybody sees Guan Kegen decide according to his demand.
300 thousand + 45 days of = are luxurious and villatic
Why always 13974669972 (with small letter)
Wang Zong 18874601288 (with small letter)