1 waterproof detail
Basic level is handled first
Before the home holds waterproof construction, must undertake handling to basic level, achieve basic level appearance the level off, solid, clean, ash that do not have float and smeary;
Processing technique: Sweep floating dust of purify of tool reference plane carefully, purify cement agglomerates and shake basic level; What after changing to providing water and electricity of horn of root, osculum, yin and yang, metope, stay is empty wait for place to undertake special processing, after processing ends, brush with wool fine sweep dirt of bequeath of tool reference plane, take dilute of right amount and waterproof coating to come milk shape, dip in with platen the data after taking dilute comes to fall and go up, first besmear of the ground after the wall brushs waterproof face, accomplish remove dust thoroughly.
Besmear is brushed should comprehensive
Besides must do waterproof between Wei Yu besides, certain family also introduced the balcony, basement to wait when decorate, and the family that introduces the ground to warm needs to be in charge of be on fire in upper berth of whole bedroom ground, accordingly these places that cause flood easily are necessary to do waterproof;
Processing technique: To conduit is being buried inside wall body, authentic wanting clean with a pointed instrument is more than the groove that provides way, the plasterer inside groove, brush waterproof coating; Like when decorating, altered original catchment and sewage conduit and floor drain position, waterproof measure must be strengthened in periphery.
Between Wei Yu waterproof 1.8 meters tall
General flower is aspersed or shower nozzle installation is in 180 centimeters tall left and right sides, if waterproof be done lowly, extended in season drenchs cause leach to penetrate wall system, can make wall body mildew changes, metope decorates a coating or face brick flakes, do not have waterproof effect thereby;
Processing technique: In principle of blame shower wall is waterproof coating cannot under 35 centimeters. But for aggrandizement waterproof action, proposal consumer is unified accomplish 180 centimeters tall; Additional, wall of small to what transform between lavatory bath system and build small system wall oneself, suggest waterproof height accomplishs coping; The 1.5 millimeter that waterproof coating must brush a country to check and accept a standard are thick.
2 waterproof examinations
1, toilet does 24 hours of tests that shut water
After report transforms an end, should do immediately waterproof. Examine the stand or fall of waterproof effect, basically shut water trial through doing;
The experiment that shut water brushs waterproof paint 12 hours in last besmear normally, need waterproof coating and basic level undertake after original well-set band; Particular operation needs to seal good doorway to reach enter the water mouth, in toilet ground harbour full water achieves 3-5 centimeter height, make mark, surface is like to not have inside 24 hours drop apparently, particularly downstair and live roof did not produce leakage, waterproof do qualification.
2, small system wall but water pouring test
Of body of light qualitative wall waterproof check and accept should take water pouring test, with the from above to below on the metope that conduit been makinging waterproof coating uninterrupted gush drenchs 3 minutes, whether can the other a side that wall system watchs after 4 hours appear permeate a phenomenon, if not have,permeate a phenomenon to be able to think metope is waterproof construction checks and accept qualification.
3 waterproof layer breakage need protection
After waterproof layer has been done even above continue construction sticks ceramic tile, often cause the damaged of waterproof layer very easily, if breakage is couldn't get,did not discover, can pose seepage in the future, because this wants to lay covering layer;
Repair normally those who use is cement joins tigidity of interfacial agent rejoin even besmear brushs waterproof agitate, the intensity after content of this kind of mix up condenses exceeds general concrete material, join rigid waterproof at the same time, such waterproof ability no risk at all.
4 kitchens, balcony also is waterproof key
When because be in,the kitchen washs dish, can different level has kitchen utensils and appliances water spills over, cause the crack seepage that water edge touchdown leaks easily, cause slack, because this kitchen also needs,do waterproof protection. 30 centimeters break up to do on floor of general proposal kitchen and wall body waterproof, 150 centimeters break up to set waterproof layer on the wall system that washs nappy to find a place for optimal; Appear because the balcony exposes outer ministry environment in, must want to do waterproof, avoid the seeper ooze such as pluvial snow to arrive downstair.