Dispatch of Chongqing evening paper (reporter He Hao) the reporter learns yesterday, the area in change is being received to oil region fine Hua Daqiao joins (first phase) engineering design undertakes publicity invite public bidding.
As we have learned, link line start is located in fine path and tube of tiger head cliff are made south Hua Daqiao between, terminus and stone oil path, Gao Jiulu forms crossed across mouth. Link line makes an appointment with 839 meters endlong (among them steel box beam bridge is about 350 meters long) , road fabric width is spent it is 8.5 meters, road grade is urban spur track.
In addition, the area in change returned construction of engineering of pair of tiger head cliff and punish of beautification of China village channel to undertake publicity invite public bidding. The reporter understands, according to channel of tiger head cliff and China village channel detect report, two channel are existing the disease such as the break of line build by laying bricks or stones of different level and leakage water. Accordingly, after this beautification punish will undertake disease punish to channel, undertake to its beautification is decorated again.