Good news! ! !
River east shanty town of Ren Jiadu of new developed area transforms a project (first phase)
A plot project is passed smoothly check and accept
This is meant, have 1348 bridal chamber again
Will deliver to a citizen very quickly
? ? ?
Ren Jiadu shanty town transforms a project (first phase) project
Yesterday (16) day, river of the city that satisfy peace east collate of construction of organization of limited company of development construction investment, ground, design, construction, inspect manages unit of main body of 5 big liability, with how to supervise the relevant section composition such as bureau of Wu of branch, water, archives to check and accept character group, to be located in river of the city that satisfy peace east the Ren Jiadu shanty town that new developed area holds the post of the home to cross a village transforms a project (first phase) A plot undertakes complete check and accept.
Check and accept group through examining engineering construction site, listen to design, construction, construction, inspect manage, detect the working report that waits for an unit, consult complete data reachs the project to discuss adequately, think this project already will stipulate content is finished entirely, project complete data is all ready, normative, project quality accords with design and normative requirement, agree with this project to be checked and accept through complete.
It is reported, ren Jiadu shanty town transforms a project (first phase) A plot 2016 start working is built, in August 2018 complete, by Sichuan Yaoshun builds group limited company bear build. This project always invests 350 million yuan, always accumulate 50 mus with the ground, total floor area makes an appointment with 154 thousand ㎡ (contain 8 buildings) , build in all have housing 1348, after consign is used, land of will older rate increases index of happiness of common people life.