Working procedure of construction of the standardization in uncovering secret earth to build constru

Project of 1 reinforcing steel bar

1. is new-style and plastic space block.

Stool of 2. plastic horse controlled the span between double deck reinforcing steel bar effectively.

3. uses has improved long iron bench to control span of double deck reinforcing steel bar to irrigating the accepts trample easily position in building concrete course, the result is favorable.

4. vertical stroke uses clamping apparatus formula to reinforcing steel bar fixed position of plastic space block.

5. board bottom uses plastic space block to control covering layer.

Project of 2 pattern plate

1. uses technology of wooden model construction. After pattern plate enters the arena, brush clear engine oil to pattern plate besmear above all, place use one week later. Before using, besmear again brush be not agent of oily drawing of patterns, can protect pattern plate effectively, improve performance of drawing of patterns, ensure concrete impressions quality.

Node of column of the bridge when 2. matchs a pattern, bridge bridge node regards working procedure pilot as the key, to ensuring the impressions quality after concrete shapes is very important.

Method of laid of 3. floor pattern plate.

Condole model position uses 4. to be controlled with the intensity, concrete space block that waits for ply, ensure condole model does not sink.

Pattern plate of 5. column wall uses excel in screw to undertake consolidate, ensure column wall section is accurate.

Consolidate of pattern plate of obligate of place of juncture of the lower level on the wall outside 6. joins, make its juncture close.

Screw of join of the buy inside 7. .

8. is used outside the wall joins (the juncture effect after form removal) .

Quality of 9. concrete exterior.

10. band muscle.

Size of node of 11. bridge column is exact, line horn is flat, concrete juncture level off is close-grained, do not have horn, drop phenomenon of oar of skin, leakage, slag inclusion.

12. coagulation person hind irrigate belt.

13. plays hole of filar lever bolt. Nod this to download construction technology data freely

14. steel structure is installed.

The burnish pouring wine cup of 15. steel structure, solder.

Mouth of a place of strategic importance after 16. fill wall -- use the ram of fine stone concrete that adds expander.

Grey machine of Qing Dynasty of 17. concrete ground.

18. cuts reinforcing steel bar of force wall ladder to apply.

19. upright model is propped up.

20. motherboard SBS is waterproof a material construction.

Reinforcing steel bar of straight thread machining uses 21. to curium expect below cut without tine, ensure treatment size is exact.

Spot of pattern plate of 22. frame column is raised set.

23. spreads keel.

24. is raised set end.

Ministry of root of 25. frame column is handled. Nod this to download construction technology data freely

26. drop waterline.

Wall of experiment of 27. heat preservation.

28. gets together benzene board heat-insulation layer.