Ordinary common people buys one flatlet too not easy, the house buys a hand, but building quality still is put in the problem more or less, should how Where is test house? Teach everybody 6 methods of house of test of semifinished product room today, discover the problem lets develop business to rectify and reform immediately.
The coolie that test house prepares provides: Bucket of feet of tape measure, level, urine, paper and pen.
1, the ground flatness that is examination bridal chamber above all
Ground flatness is the place of oversight of a lot of person test house, do not look down upon the problem of flatness, with horizontal feet ground tries to know.
Occasionally same the ground discretion difference of a room can have 3 centimeters, if this does not have discovery, the fee that asks area of master make level in the future does not issue 5000 yuan.
2, the conduit below the examination is expedite
Construction when, a lot of cement piece with sand, jam very easily next conduit. Need examination is very easy also, use brought pail replete water, see current whether can be discharged smoothly know to whether exist jam.
If jammed, want to maintain commonly, wait for downstair neighbour to decorate nice gift to discover, mendouke can be entered do not go.
3, circle of examination toilet fire prevention
Bridal chamber can assemble group of this kind of fire prevention now, do not look down upon it, when producing fire, fire prevention circle can be tightened up automatically, place next conduit, such igneous situation won't spread up down next conduit, it is fire prevention god simply implement.
If old building does not have fire prevention to encircle, it is the standard that thinks to there still is not compulsive installation at that time.
4, the examination is waterproof
The examination is waterproof it is very important segment, need does the test of 72 hours that shut water. Stem the offal of toilet mouth, in toilet replete water, must await 72 hours, whether is the examination put in slack phenomenon, discover a problem, should contact development immediately business redo is waterproof.
5, the sealing of inspection door window
The window is compared one piece this relatively simple, need to check only airtight sex and whether can normal open, if be sealing strip,have a problem, can ask development business is reinstalled.
6, the area that checks a building
Do not think how much area yield evidence is, how much is your house area. Ask stylist to come to measure a room to just know, so this also is possible shrink together. If the area differs,exceed 2% , can raise claim for compensation to development business.
Good, introduce here about 6 methods of test house, did you remember?