One, fittings of raw material, finished product, semi-manufactured goods, compose
Cement and additive, sophisticate expects
1, examine content: Cement and additive, sophisticate expects.
2, examination example chooses: Part 2 not less than material batch entering the arena.
3, check a method: Report of examination product certificate of conformity, routine inspection test, enter the arena answer test report.
4, the evaluation decides principle: The product leaves factory certificate of conformity and report of routine inspection test are not all ready; Did not enter the arena by normative requirement answer check or answer check up to specification sets and do not design a requirement. Decide for " do not accord with " .
5, according to: " quality of construction of concrete construction project checks and accept a standard (GB50204, 2015) " the 7.2.1st, 7.2.2, " quality of construction of project of construction of system of build by laying bricks or stones checks and accept a standard (GB50203-2011) " the 4.0.1st.
Reinforcing steel bar and reinforcing steel bar solder, mechanical join material
1, examine content: Reinforcing steel bar and reinforcing steel bar solder, mechanical join material.
2, examination example chooses: The main reinforcing steel bar getting power of 2 kinds of not less than norms, and every kinds of norms 2 not less than material batch entering the arena; Selective examination all sorts of reinforcing steel bar solder, mechanical join material parts a not less than material batch entering the arena.
3, check a method: Report of examination product certificate of conformity, routine inspection test, enter the arena answer test report and type examine report.
4, the evaluation decides principle: Report of product certificate of conformity, routine inspection test, type examines the report is not all ready; Did not enter the arena by normative requirement answer check or answer check up to specification sets and do not design a requirement. Decide for " do not accord with " .
5, according to: " quality of construction of concrete construction project checks and accept a standard (2011 edition, GB50204, 2002) " the 5.2.1st, 5.2.2, " reinforcing steel bar solders reach check and accept a standard (JGJ18-2012) " the 3.0.6th, " regulations of technology of join of machinery of reinforcing steel bar (JGJ107-2010) " the 7.0.1st, 7.0.3.
Brick, block, fill wall block, postposition is buried
1, examine content: Brick, block, fill wall block, postposition is buried.
2, examination example chooses: Part 2 not less than material batch entering the arena.
3, check a method: Report of examination product certificate of conformity, routine inspection test, enter the arena answer test report.
4, the evaluation decides principle: Report of the certificate of conformity of the product, routine inspection test is not all ready; Did not enter the arena by normative requirement answer check or answer check up to specification sets and do not design a requirement. Decide for " do not accord with " .
5, according to: " quality of construction of project of construction of system of build by laying bricks or stones checks and accept a standard (GB50203-2011) " the 3.0.1st, 5.2.1, 6.2.1, 9.2.1.
Ready mixed concrete, mortar
1, examine content: Ready mixed concrete, mortar.
2, examination example chooses: Part 2 not less than material batch entering the arena.
3, check a method: Check report of product certificate of conformity, routine inspection test.
4, the evaluation decides principle: Report of product certificate of conformity, routine inspection test is not all ready, decide for " do not accord with " .
5, according to: 1, " quality of construction of concrete construction project checks and accept a standard (2011 edition, GB50204-2002) " the 7.4.1st, " quality of construction of project of construction of system of build by laying bricks or stones checks and accept a standard (GB50203-2011) " the 5.2.1st, 6.2.1, 9.2.1.
Steel structure is reached with rolled steel solder, fastener join material
1, examine content: Steel structure is reached with rolled steel solder, fastener join material.
2, examination example chooses: Part a not less than material batch entering the arena.
3, check a method: Label of the file of quality qualification proof that checks a product, Chinese, examine report.
4, the evaluation decides principle: Label of the file of quality qualification proof of the product, Chinese, examine the report is not all ready; Did not enter the arena by normative requirement answer check or answer check up to specification sets and do not design a requirement. Decide for " do not accord with " .
5, according to: " quality of construction of steel structure engineering checks and accept a standard (GB50205-2001) " the 4.2.1st, 4.2.2, 4.3.1, 4.3.2, 4.4.1, 4.4.2, 4.4.3, 4.5.1, 4.5.2, 4.6.1, 4.7.1, 4.8.1, 6.2.1.
Prefabricated components reachs ground tackle of prestressing force concrete, clamping apparatus
1, examine content: Prefabricated components reachs ground tackle of prestressing force concrete, clamping apparatus.
2, examination example chooses: Part 2 not less than material batch entering the arena.
3, check a method: Report of the certificate of conformity that inspects a product, routine inspection test, enter the arena function of answer test report, structure detects report.
4, the evaluation decides principle: Report of the certificate of conformity of the product, routine inspection test is not all ready; Did not enter the arena by normative requirement answer check or answer check up to specification sets and do not design a requirement. Decide for " do not accord with " .
5, according to: " quality of construction of concrete construction project checks and accept a standard (2011 edition, GB50204, 2002) " the 6.2.1st, 6.2.2, 6.2.3, 6.2.4, 9.1.1, 9.3.1, 9.4.1.
Waterproof
1, examine content: Waterproof.
2, examination example chooses: Different material parts a not less than material batch entering the arena.
3, check a method: The certificate of conformity that inspects a product, enter the arena examine function of report, product examines report.
4, the evaluation decides principle: The certificate of conformity of the product, enter the arena to examine or produce moral character to be able to examine the report is not all ready; Did not enter the arena by normative requirement answer check or answer check up to specification sets and do not design a requirement. Decide for " do not accord with " .
5, according to: " quality of subterranean waterproof project checks and accept a standard (GB50208-2011) " the 3.0.7th, 4.3.15, 4.4.7.
2, construction test report
Foundation intensity or bear the weight of force examines picket of report, project bears the weight of force and picket body integrality examine report
1, examine content: Foundation intensity or bear the weight of force examines picket of report, project bears the weight of force and picket body integrality examine report.
2, examination example chooses: Total number examination.
3, check a method: Examine foundation strength or bear the weight of force examines picket of report, project bears the weight of force and picket body integrality examine report, solder report of the flaw detection that receive stake.
4, the evaluation decides principle: Did not examine by normative requirement foundation intensity or bear the weight of picket of force, project bears the weight of of force and picket body integrality; Foundation intensity or bear the weight of picket of force, project bears the weight of force and picket body integrality examine to up to specification sets and do not design a requirement. Decide for " do not accord with " .
5, according to: " quality of project of building foundation foundation checks and accept a standard (GB20202-2002) " the 4.1.5th, 4.1.6, 5.1.5, 5.1.6, 5.2.3, 5.3.2, 5.4.2, " build standard of picket radical technology (JGJ94-2008) " the 9.4.2nd, 9.4.3, 9.4.4, 9.4.5, 9.4.6.
Report of test of compressive strength of concrete test block reachs statistical assess
1, examine content: Report of test of compressive strength of concrete test block reachs statistical assess.
2, examination example chooses: Report of test of compressive strength of concrete test block undertakes selectiving examination, the assess when main body structure seals a top quickly but total number examination.
3, check a method: Check report of test of compressive strength of concrete test block and statistical assess.
4, the evaluation decides principle: Concrete test specimen leaves buy to not agree with add up to normative regulation; Statistical assess result is unqualified. Decide for " do not accord with " .
5, according to: " quality of construction of concrete construction project checks and accept a standard (2011 edition, GB50204, 2002) " the 7.4.1st.
Report of test of compressive strength of mortar test block reachs statistical assess
1, examine content: Report of test of compressive strength of mortar test block reachs statistical assess.
2, examination example chooses: Report of test of compressive strength of mortar test block undertakes selectiving examination, statistical assess but total number examination.
3, check a method: Check report of test of compressive strength of mortar test block and statistical assess.
4, the evaluation decides principle: Mortar test specimen leaves buy to not agree with add up to normative regulation; Statistical assess result is unqualified. Decide for " do not accord with " .
5, according to: " quality of construction of engineering of body of build by laying bricks or stones checks and accept a standard (GB50203-2011) " the 4.0.12nd.
Reinforcing steel bar solders, report of test of mechanical join craft
1, examine content: Reinforcing steel bar solders, report of test of mechanical join craft.
2, examination example chooses: Total number examination.
3, check a method: Examination reinforcing steel bar solders, report of test of mechanical join craft.
4, the evaluation decides principle: Did not undertake by normative requirement craft experiments. Decide for " do not accord with " .
5, according to: " reinforcing steel bar solders reach check and accept a standard (JGJ18-2012) " the 4.1.3rd, " regulations of technology of join of machinery of reinforcing steel bar (JGJ107-2010) " the 7.0.2nd.
Reinforcing steel bar solders, report of mechanical connection trial
1, examine content: Reinforcing steel bar solders, report of mechanical connection trial.
2, examination example chooses: 2 kinds of not less than norms basically get force reinforcing steel bar even (solder) receive, every kinds of norms batch of not less than 2 second-round exams.
3, check a method: Examination reinforcing steel bar solders, report of mechanical connection trial.
4, the evaluation decides principle: Did not undertake second-round exam or second-round exam up to specification sets and do not design a requirement by normative requirement. Decide for " do not accord with " .
5, according to: " quality of construction of concrete construction project checks and accept a standard (2011 edition GB50204, 2002) " the 5.4.2nd, " reinforcing steel bar solders reach check and accept a standard (JGJ18-2012) " the 5.1.7th, 5.1.8, " regulations of technology of join of machinery of reinforcing steel bar (JGJ107-2010) " the 7.0.7th, 7.0.8.
Steel structure joins (solder) quality detects report
1, examine content: Steel structure joins (solder) quality detects report.
2, examination example chooses: The join of the same link type, same condition that apply solder (solder) batch of not less than a second-round exam.
3, check a method: Examination steel structure joins (solder) quality detects report.
4, the evaluation decides principle: Did not undertake by normative regulation regulation and design ask detect or detecting notting agree with adding up to a standard. Decide for " do not accord with " .
5, according to: " quality of construction of steel structure engineering checks and accept a standard (GB50205-2001) " the 5.2.3rd, 5.2.4, 6.3.1
Backfill earth examines report
1, examine content: Backfill earth examines report.
2, examination example chooses: Not less than 1 examines batch.
3, check a method: Examination backfill earth examines report, blueprint paper.
4, the evaluation decides principle: Did not undertake by design and normative requirement backfill earth examines or examine to up to specification sets and do not design a requirement. Decide for " do not accord with " .
5, according to: " quality of construction of project of building foundation foundation checks and accept a standard (GB50202 - 2002) " the 6.3.3rd, 6.3.4.
Sedimentation observation record
1, examine content: Sedimentation observation record.
2, examination example chooses: Total number examination.
3, check a method: The examination sedimentations observation record, blueprint paper.
4, the evaluation decides principle: Sedimentation observation dot is decorated reach observation frequency second, sedimentation metabolic deflection up to specification sets and do not design a requirement. Decide for " do not accord with " .
5, according to: " the project measures a standard (50026-2007) " the 10.1.10th, 10.5.8.
3, construction record
Cement and additive, concrete and mortar, reinforcing steel bar and join connect, brick, block, waterproof, steel structure uses rolled steel, solder material, fastener enter the arena check and accept record and testimony sampling and record sending check
1, examine content: Cement and additive, concrete and mortar, reinforcing steel bar and join connect, brick, block, waterproof, steel structure uses rolled steel, solder material, fastener enter the arena check and accept record and testimony sampling and record sending check.
2, examination example chooses: Of 3 kinds of not less than material enter the arena check and accept record, testimony to sampling is recorded and send check the record.
3, check a method: The examination enters the arena check and accept record, testimony to sampling is recorded and send check the record.
4, the evaluation decides principle: Did not enter the arena by normative regulation check and accept reach testimony sampling and send check. Decide for " do not accord with " .
5, according to: " quality of construction project construction checks and accept uniform standard (GB50300-2013) " the 3.0.2nd.
Picket radical tries the picket, record that become stake
1, examine content: Picket radical tries the picket, record that become stake.
2, examination example chooses: Picket radical tries stake notes to selective examination not less than 1; Not with the type picket radical becomes stake notes to selective examination respectively not less than 1.
3, check a method: Check record trying picket and blueprint of the record that become stake, design.
4, the evaluation decides principle: Did not ask to undertake trying picket by normative regulation and design; The record that become stake is non-standard. Decide for " do not accord with " .
5, according to: " build standard of picket radical technology (JGJ94-2008) " the 9.3.1st, 9.3.2.
Concrete construction record, concrete wintry period construction is lukewarm accuse to accumulate concrete construction record, roughly lukewarm accuse a record
1, examine content: Concrete construction record, concrete wintry period construction is lukewarm accuse to accumulate concrete construction record, roughly lukewarm accuse a record.
2, examination example chooses: Concrete construction record, concrete wintry period construction is lukewarm accuse to accumulate concrete construction record, roughly lukewarm accuse a record to part not less than 1.
3, check a method: Record of examination concrete construction, concrete wintry period construction is lukewarm accuse to accumulate concrete construction record, roughly lukewarm accuse a record.
4, the evaluation decides principle: 1, did not undertake concrete construction record, concrete by normative requirement wintry period construction is lukewarm accuse to accumulate concrete construction record, roughly lukewarm accuse a record; 2, the record is non-standard. Decide for " do not accord with " .
5, according to: " quality of construction of concrete construction project checks and accept a standard (2011 edition, GB50204, 2002) " the 7.1.5th, 7.4.4, 7.4.5, 7.4.6, 7.4.7. " standard of construction of large volume concrete (GB50496-2009) " the 6.0.1st, 6.0.2, 6.0.5, 6.0.6.
The tensioning, installation of prestressing force muscle and grouting are recorded
1, examine content: The tensioning, installation of prestressing force muscle and grouting are recorded.
2, examination example chooses: The tensioning, installation of prestressing force muscle and record of form a vesicle part not less than 1.
3, check a method: Examine the tensioning, installation of prestressing force muscle and record of form a vesicle.
4, the evaluation decides principle: 1, did not ask to have the tensioning, installation of prestressing force muscle and be in the milk by normative regulation and design; 2, the record is non-standard. Decide for " do not accord with " .
5, according to: " quality of construction of concrete construction project checks and accept a standard (2011 edition, GB50204, 2002) " the 6.4.2nd, 6.4.3, 6.4.4, 6.5.1.
Hoisting of prefabricated components, steel structure is recorded
1, examine content: Hoisting of prefabricated components, steel structure is recorded.
2, examination example chooses: Not less than 2 hoisting are recorded.
3, check a method: Examine record of hoisting of prefabricated components, steel structure.
4, the evaluation decides principle: 1, did not undertake hoisting of prefabricated components, steel structure by normative requirement; 2, the record is non-standard. Decide for " do not accord with " .
5, according to: " quality of construction of concrete construction project checks and accept a standard (2011 edition, GB50204, 2002) " the 9.4.2nd, 9.4.3, 9.4.8, " quality of construction of steel structure engineering checks and accept a standard (GB50205-2001) " appendix J.
Net of verticality of steel structure whole and integral plane flexibility, steel wears deflection to examine record
1, examine content: Net of verticality of steel structure whole and integral plane flexibility, steel wears deflection to examine record.
2, examination example chooses: Total number examination.
3, check a method: Net of verticality of whole of examination steel structure and integral plane flexibility, steel wears deflection to examine record.
4, the evaluation decides principle: 1, did not undertake by normative requirement net of verticality of steel structure whole and integral plane flexibility, steel wears deflection to examine; 2, examine to up to specification sets and do not design a requirement. Decide for " do not accord with " .
5, according to: " quality of construction of steel structure engineering checks and accept a standard (GB50205-2001) " appendix J.
Force of record of muscle of establish of body of fill wall build by laying bricks or stones, anchorage firm detects report
1, examine content: Force of record of muscle of establish of body of fill wall build by laying bricks or stones, anchorage firm detects report.
2, examination example chooses: Force of establish muscle record, anchorage firm detects report each not less than 1.
3, check a method: Force of record of muscle of establish of body of build by laying bricks or stones of examination fill wall, anchorage firm detects report.
4, the evaluation decides principle: 1, did not have anything resembling a tendon or vein of establish of body of fill wall build by laying bricks or stones by normative requirement, did not undertake anchorage firm force detects; 2, muscle of establish of body of fill wall build by laying bricks or stones records force of non-standard, anchorage firm to detect report up to specification sets and do not design a requirement. Decide for " do not accord with " .
5, according to: " quality of construction of engineering of body of build by laying bricks or stones checks and accept a standard (GB50203-2011) " the 9.2.3rd.
Check of structural solid check-up is recorded
1, examine content: Check of structural solid check-up is recorded.
2, examination example chooses: Total number examination.
3, check a method: Check check of structural solid check-up to record.
4, the evaluation decides principle: 1, did not undertake by normative requirement structural substance examines; 2, structural substance examines to up to specification sets and do not design a requirement as a result. Decide for " do not accord with " .
5, according to: " quality of construction of concrete construction project checks and accept a standard (2011 edition, GB50204, 2002) " 10.1.1, 10.1.2, 10.1.3, 10.1.4, 10.1.5.
4, quality checks and accept a record
Foundation check chamfer is recorded
1, examine content: Foundation check chamfer is recorded.
2, those who check place choose: This project is when chamfer of one-time whole check " foundation check chamfer is recorded " , section or branch building the closest that day generation checks to be apart from when check chamfer " foundation check chamfer is recorded " .
3, check a method: Examine " foundation check chamfer is recorded " record related content etc, examine the report.
4, the evaluation decides principle:
(1) whether to check base level of ground of the position of hole, planar dimension, hole;
(2) whether to check base hole is earthy with groundwater circumstance;
(3) blindage of acupuncture point, barrow, ancient to be free well, air defence and underground bury those who set thing, whether to check its position, deepness, character; Whether to have light-duty dynamic sounding test according to standard and design requirement;
(4) foundation, arenaceous to grey earth with arenaceous stone foundation, earth labour synthesizes foundation of foundation of material foundation, fly ash foundation, strong pound, grouting, press foundation beforehand, the result after its complete (foundation intensity or bear the weight of force) the level that whether reachs design requirement, examine whether does the amount satisfy normative requirement;
(5) eject of compound to picket of water clay agitate foundation, high pressure notes an oar picket of compound foundation, arenaceous picket foundation, Zhen Chong is compound foundation, earth and grey earth push close stake picket of clastic rock of fly ash of compound foundation, cement is compound cement of foundation, tamp, its bear the weight of the standard that force examines to whether achieve a design to ask as a result, examine whether does the amount satisfy normative requirement;
(6) to picket foundation, whether did project picket undertake force examines bearing the weight of, bear the weight of force examines to whether accord with a design as a result requirement, examine picket is counted whether requirement of up to specification, time of picket body quality undertook examining, examine the result is eligible, examine amount whether requirement of up to specification.
(7) the foundation that asks to satisfying a design, whether the foundation that affirms via designing an unit handles the plan, ground that whether has this place to handle a record.
" foundation check chamfer is recorded " in 1 does not accord with afore-mentioned requirements, decide for " do not accord with " .
5, according to: " quality of construction of project of building foundation foundation checks and accept a standard (GB50202-2002 " the 4.1.5th, 4.1.6, 5.1.5, 5.1.6, A.1.1, A.2.1, A.2.3, A.2.4, A.2.5, A.2.6.
Picket elevation of top of deviation, picket checks and accept a record
1, examine content: Picket elevation of top of deviation, picket checks and accept a record.
2, check place choose: Picket foundation is this project when one-time whole construction " picket elevation of top of deviation, picket checks and accept a record " , section or branch building apply man-hour to arise recently that day to be apart from an examination " picket elevation of top of deviation, picket checks and accept a record " .
3, check a method: Examine " picket elevation of top of deviation, picket checks and accept a record " record related content etc.
4, the evaluation decides principle: To prefab picket, steel picket, picket deviation nots agree with add up to a standard to ask; To perfusion picket, picket elevation of top of deviation, picket nots agree with add up to normative requirement; Decide for " do not accord with " .
5, according to: " quality of construction of project of building foundation foundation checks and accept a standard (GB50202-2002 " the 5.1.3rd, 5.1.4.
Take cover engineering checks and accept a record
1, examine content: Take cover engineering checks and accept a record.
2, check place choose: Choose randomly " take cover engineering checks and accept a record " .
3, check a method: Examine " take cover engineering checks and accept a record " reach relevant accessory.
4, the evaluation decides principle:
(1) place of check of date of check of concealed check project, concealed, concealed is specific;
(2) concealed check basis (construction plan bugle call, design is changed / standard of palaver, technology) specific;
(3) main material name, norms, type is specific; Concealed check content is specific;
(4) answer by the regulation keep is video of the data, whether to add concealment the video data of place;
(5) whether to have clear examination opinion and examination verdict;
(6) if have,check, whether to have check conclusion, check date and check the person signs;
(7) sign column signs all ready, whether by quality of major of construction unit project (technology) qualitative check of chief, major member, professional section chief, inspect manages (construction) unit major engineer undertook signing admitting.
" take cover engineering checks and accept a record " in 1 does not accord with afore-mentioned requirements, decide for " do not accord with " .
5, according to: Regulations of government of project seat data, " quality of construction project construction checks and accept uniform standard (GB50300-2013) " .
Examine batch, cent, branch (child branch) check and accept a record
1, examine content: Examine batch, cent, branch (child branch) check and accept a record.
2, check place choose: Form recently " examine approve quality to check and accept a record " , " divide a project quality to check and accept a record " , " branch (child branch) project quality checks and accept a record " each one.
3, check a method: Examine " examine approve quality to check and accept a record " , " divide a project quality to check and accept a record " , " branch (child branch) project quality checks and accept a record " reach relevant accessory.
4, the evaluation decides principle:
(1) " examine approve quality to check and accept a record " whether to fill in by inspector of quality of construction project major;
(2) " examine approve quality to check and accept a record " in " name of construction executive standard and number " , " advocate charge an item " , " average project " column fills in normative;
(3) " divide a project quality to check and accept a record " in examine batch of place, section is all ready;
(4) " branch (child branch) project quality checks and accept a record " neutron branch (cent) the project is all ready;
(5) " construction unit checks assess (record / result / conclusion) " column fills in normative;
(6) " check and accept a record (opinion / conclusion) " column fills in clear;
(7) whether are concerned unit and each relevant personnel " examine approve quality to check and accept a record " , " divide a project quality to check and accept a record " , " branch (child branch) project quality checks and accept a record " in sign accordingly column signs;
" examine approve quality to check and accept a record " , " divide a project quality to check and accept a record " , " branch (child branch) project quality checks and accept a record " in 1 does not accord with afore-mentioned requirements, decide for " do not accord with " .
5, according to: Construction examines in constituent design batch, separate a project, branch (child branch) of the project differentiate method, " quality of construction project construction checks and accept uniform standard (GB50300-2001) " .
Processing of project quality problem and check and accept a record
1, examine content: Processing of project quality problem and check and accept a record.
2, those who check place choose: Form recently " processing of project quality problem and check and accept a record " .
3, check a method: Examine " processing of project quality problem and check and accept a record " record related etc.
4, the evaluation decides principle:
(1) redo of classics do poorly done work over again or change of implemental, equipment examine batch, whether to undertake checking and accept afresh;
(2) to cannot redo of do poorly done work over again or change of implemental, equipment examine batch, whether via having aptitude detect the unit undertakes detecting appraisal, detect whether did the result achieve design requirement, whether to undertake checking and accept afresh;
(3) via having aptitude detect the unit detects design of appraisal short of asks examine batch, whether via designing unit business accounting formerly, safety of whether contented structure mixes business accounting result use function, whether to undertake checking and accept afresh;
(4) the branch project that still cannot satisfy safe use requirement through repair or consolidate processing, unit (child unit) project, forbidden check and accept;
" processing of project quality problem and check and accept a record " in 1 does not accord with afore-mentioned requirements, decide for " do not accord with " .
5, according to: " quality of construction project construction checks and accept uniform standard (GB50300-2013) " .