Fujian casts battalion carry center is Fuzhou the freeboard layer of first subway upper cover builds a project, this project is the project with Fuzhou technology the biggest difficulty, it is first local subways and upper cover of building union subway build a project, also be to be located in the Fuzhou City most the mark sex with 51 square highest area builds central a sector of an area.
This project total floor area builds one for 106421.49 ㎡ individual event, go up among them floor area 65579.35 ㎡, annex 5, subterranean floor area 40842.14 ㎡; The ground builds brim mouth height to be 118.65 meters, among them, office building 28 (among them: Advocate building 23) , on hotel land 22 (among them: Advocate building 17) , basement is lose 4. Greenbelt is led not under 25% .