Today (on June 25) afternoon at 1 o'clock 30 the left and right sides, double general drifting a division falls rainstorm, xi Hang harbor is street village of light of Great Wall road 2 paragraphs of seeper are serious, deepness of the deepest seeper exceeded footpath of road both sides height, created vehicle of this a section of a highway relatively embrace.
Xi Hang harbor is street and bright community two appoint team and staff member are driven in time go to the spot, organize personnel delay Du Baochang, catchment clear silt.
Receive alarm after affection, 2 squadron start group of double policeman drifting a division quickly rainstorm weather alarm affection beforehand case, drive toward seeper a section of a highway to spread out traffic dredge to work, traffic embraces a phenomenon to get alleviating.
Below the joint efforts of staff member of rush to deal with an emergency, controlled seeper of this a section of a highway 16:10 gradually subsidise, traffic returns to normal.