Air entrainment piece ruptures, cannot go up wall
Air entrainment piece ruptures, should not go up wall
Spot mortar was not used store inside the special container with not bibulous existence, place time to grow too, can go up person. Cannot use.
Fixed place did not use aluminous window other a system is local embed build by laying bricks or stones, cause it is on air entrainment piece with shoot a hammer to secure, put in safe hidden trouble.
In chamfer of level of the cut on wall body, affect wall style quality.
Aerocrete block mouth of a cave two side, did not choose the block build by laying bricks or stones with orderly norms to build.
Pattern plate of basic level existence was not demolished with respect to body of construction build by laying bricks or stones
Pattern plate of basic level existence was not demolished with respect to body of construction build by laying bricks or stones
Ply of arenaceous brick of bottom of body of build by laying bricks or stones is little ask at the standard (height not less than 200mm) ; Width exceeds the upside of mouth of a cave of 300mm, should install ferroconcrete lintel; Lintel lays aside length little ask at the regulation (structure of system of build by laying bricks or stones designs 240mm of normative GB50003-2001 requirement; Evaporate presses aerocrete to build lintel of mouth of a cave of body of wall of applied technology regulations, had extended both sides of mouth of a cave to lay aside length every edge must not be less than body of 300mm) , build by laying bricks or stones to take place " equestrian tooth rub " (when facing time to break, can stay into inclined rub, must not stay " equestrian tooth rub " ) , not wrong seam build receive (perpendicular to seam should not be more than 2 skins) .
Of obligate outside wall window presses a two end to did not extend wall system inside.
Establish muscle quality (length is less than 100mm, powder to was not blown clean) do not accord with a requirement, put in hidden trouble.
Length of the reinforcing steel bar that help a tie exceeds length of body of build by laying bricks or stones (mouth of an opening in a wall of gate of system of build by laying bricks or stones did not install control line to cause) .
Establish muscle span crosses extreme of the big, muscle that help a tie to did not set 90 ° to bend a hook, do not accord with a requirement.
Reinforcing steel bar did not see inside tectonic column, put in quality hidden trouble.
Inside tectonic column did not join with structure of bottom main body, coping, put in quality hidden trouble.
The tool that cut a brick does not accord with a requirement.
Lintel length is too big
Width of conduit well mouth of a cave is more than 300mm to did not do ferroconcrete lintel.
Coping of mouth of an opening in a wall should set concrete lintel, the spot was not handled install a window, secure not firm, put in hidden trouble.
Height of body of build by laying bricks or stones exceeds 5 meters more than 4 meters to did not ask to install tectonic column and girth by the standard with length
Ply of arenaceous brick of bottom of body of build by laying bricks or stones is little ask at the standard (height not less than 200mm) .
Construction completes the top brick of body of build by laying bricks or stones and the form of build by laying bricks or stones below. Put in quality hidden trouble.
Space of place of brick of top of body of build by laying bricks or stones is too little (6-7 centimeter)
The mortar carrying a brick on the head of body of build by laying bricks or stones is not full, put in quality hidden trouble.
Bricklaying ash seams mortar not full, put in quality hidden trouble.
Bricklaying edge damage drops horn, impressions is poorer.