Big the daily life of a family says to decorate water very deep, decorate feline be bored with a lot of. Because we do not understand,basically be, do not understand, and the working procedure that decorates itself to involve very building materials category is much and miscellaneous, for the person that decorates to firm contact accordingly, difficulty sees one spot, share what look somewhere else to decorate feline be bored with with everybody here today, the worker in be being decorated commonly can adopt what way practise deception, perpetrate a fraud, learn ahead of schedule, happen on him body really to moment in case.
1 base handles slack off index: ★ of ★ of ★ ★ ★
Phenomenon: Before besmear brushs emulsioni paint, shop to stick wall floor tile, must do good base processing. Some workers are in when construction this respect is jerry, light cause metope rough whole, emulsioni paint besmears the coloured after brushing is differred, weigh an emulsioni paint to become angry fall off, or ceramic tile is stickup not firm.
The expert reminds: In the shop outfit construction of wall floor tile, you should notice ceramic tile cannot be spread directly cream in lime mortar, lime, paper muscle lime creams, hemp lime white and emulsioni paint apparently, the processing that pull hair is done after wanting to handle basic level side clean however square can laid. The felt starch that uses between ceramic tile and base expects, answer to be allocated strictly according to construction standard and scale, stuff of glue of cement of use regulation grade, felt, cannot allocate at will.
When besmear brushs emulsioni paint, you must notice metope be bored with child wrap around blow flowing, burnish and roll besmear to whether reach the designated position wait for a problem. Additional, you should notice whether the add water of emulsioni paint is appropriate.
Index of slack off of 2 grounds make level: ★ of ★ of ★ ★ ★
Phenomenon: The ground of some buildings is insufficient level off, new make level needs in decorate. If the worker is insufficient attentive or intended manufacture in a rough way, can cause " look for rougher more " problem, and the cement mortar that uses in construction still can increase ground load greatly, bring hidden trouble completely to Lou Tian. Normal operation does not do protection to be able to return sand very serious, some is only above sand scatter a cement to overspread unconscious owner.
The expert reminds: Before having ground make level, the base that must become nice area first is handled, have ground make level with cement mortar next. After cement doing is appeared, decide the flatness of whole area with appropriative level feet, if discover the skin since cement,should lever look. Undertake again next next construction.
3 small handle slack off index: ☆ of ★ of ★ ★ ★
Phenomenon: Alleged " small area " , it is eye of a few consumer cannot see, not quite advertent little place, for example door of the door go up of bedplate of edge, window below, the place waits inside central heating overspreads, some workers are met here jerry, can not do any processing even.
The expert reminds: Remembering any objects have 6 plane, do not want oversight any detail when quality of inspection man Cheng.
4 electrical wiring wear index of tubal slack off: ☆ of ★ of ★ ★ ★
Phenomenon: Construction is decorated in the family in, almost all electrical wiring is to wear in PVC canal, dark bury inside wall. After because this electrical wiring is worn,be in charge of into PVC, consumer is lost sight of at all, and it is more difficult to change. If the worker is not serious in the operation, can bring about electrical wiring to be inside the canal twist together, cause the hidden trouble that use phone. If the worker is intended jerry, can use take the wire of contact or wear a few electrical wiring inside canal of same root PVC.
The expert reminds: Consumer had better be checked and accept to what buying wire, control worker operation in the spot next, after installation ends, should undertake electrify examines. Additional, consumer must make construction square leave a piece " cop pursues " . When just burying electrical wiring into wall when electrician, can make up these wall on number draws a plan, give the trend of electrical wiring and specific seat with strokes then, make clear go up be apart from next floor, position that reach adjacent metope from the ground, should indicate particularly the contact position of cop, such once appear breakdown, can search line position immediately.
5 juncture decorate slack off index: ★ of ★ ★ ★
Phenomenon: Be in the butt joint place of a few metope and door, window, and the place of butt joint of coating of two kinds of different color, also be workers often the place of muddle through one's work. You often can see emulsioni paint and wood make the coating between mutual and jumbly, juncture office appears all sorts of problems. Have more very person the besmear on carpentry whitewashs the wall lacquer.
The expert reminds: The processing to juncture is very important, you must supervise a worker serious construction. When if be on metope,the painting that has two kinds of color is received relatively, the edge place of the first kind of color must be in to affix adhesive plaster in construction, brush the paint of another kind of color in the besmear on its again, after wanting to end in construction only so, rip go adhesive plaster, whole juncture is OK special neat.
Index of slack off of chamfer of 6 metope get rid of: ☆ of ★ ★ ★
Phenomenon: Dark bury cop to must open slot on wall and ground, embedded of ability general cop. A few worker is undertaking groove operates construction of Shi Ye pretty, destroyed a building to bearing not only structure, cause damage likely still to the other cop around.
The expert reminds: Before construction, should affirm the trend of cop and position again with construction header. Be aimed at different wall system structure, the demand that drives groove is different also: The main wall inside the building does not allow groove, and after the wall substance that contains heat-insulation layer is opening slot, craze is caused very easily in the surface, and slot opens in the ground, should take care to cannot destroy floor more, cause a trouble to downstair resident.
Shop of 7 walls floor tile sticks slack off index: ★ ★ ★
Phenomenon: Spreading the floor tile that stick a wall is technical stronger working procedure. If workers are jerry, appear the most easily to wait for a problem not strike of ceramic tile air, together to seaming, the cement that additionally the shop sticks ceramic tile to use and stick receive an agent to also have exquisite, if match,compare unreasonable also can appear fall off wait for a problem. Additional, full range wall appears very easily spell stubble, what should be driven in the wall stay here the position has been designed ahead of schedule.
The expert reminds: Build according to Beijing appoint come on stage " quality of project of domestic bedroom adornment checks and accept a standard " in, requirement wall floor tile spreads Tie Yingping to rectify clarity of firm, design, without bilge and oar mark, exterior colour and lustre agrees basically, juncture is even, board piece flawless, drop horn and edge damage, local air strike must not exceed 5% of gross.
Index of slack off of connect of 8 electrical wiring: ★ ★ ☆
Phenomenon: When electrician is installing socket, switch and lamps and lanterns, do not press construction demand wiring. Use a few power consumption in consumer especially when the electric equipment such as bigger water heater, air conditioning, cause switch, electrical outlet to give out heat even burn down, brought very big loss to consumer.
The expert reminds: In construction supervisory electrician undertakes construction strictly according to operating rules, in all switch, electrical outlet installation ends hind, must undertake actual use, see these place whether have calorific appearance.
Index of slack off of 9 conduit road: ★ ★
Phenomenon: When construction group is undertaking decorating, sometimes for graph save trouble, will contain a large number of cement, sand and concrete shiver to pour sewer. The immediate consequence that such doing jams badly namely sewer, because enter the water,cause kitchen and toilet not free and run water. Although some projects do not have a problem when be checked and accept finally, but always give now water not the problem of free.
The expert reminds: Control construction group strictly, cannot take sewer to be used when rubbish path. After canalage construction ends, basin of all birdbath, face and water of bath crock flood, turn on the water at the same time next, look enter the water whether unobstructed, whether does pipeline have the problem of leakage.
10 metope brush index of lacquer slack off: ★ ☆
Phenomenon: Emulsioni paint is at present the commonnest metope decorates material, can undertake besmearing brushing in specific construction, roller besmear or spray. If the worker is when construction not serious or muddle through one's work, regular meeting appears little off color. Especially the emulsioni paint with deeper color can appear more this kind of problem. Much add water saves lacquer effect difference.
The expert reminds: Emulsioni paint needs to add certain clear water before use, the emulsioni paint that has allocated should give out. The coating of same color also had better besmear brush end. If face of construction ending back wall needs to repair, be about to brush whole metope recoat. (Best him owner buys wall paint)
The construction cat be bored with that 10 middling see above, basically covered the square respect range that holds construction forcedly, it is take cover engineering more very among them, consider to discover, great majority is held jerrily in business of take cover engineering, remind the friends that should decorate again so, open pairs of big eyes, be in otherwise can have endless trouble in the future.