The detailed working procedure that decorate, my enumerate that understands simply to everybody detailed working procedure, make clear the problem that every working procedure may appear mainly. And the time that every working procedure needs, without giving thought to later everybody is him decorate or look for a company to decorate, I think what can use.
1. demolishs build wall system: 5 days
If building construction has unreasonable place to need to tear open,change, that is the first pace that decorate certainly. Because all decorating,undertake on the frame in the house, say frame is decided so, ability is decorated.
When building wall system, must remember playing reinforcing steel bar, help a network, reduce the hidden danger of later period craze, building wall body craze is a pain spot in decorating, appear very easily.
2. equipment installs: 7 arrive 15 days
Decorate did not move, equipment start off before the others. Set stock: Central air conditioning, new wind, air can be waited a moment.
If be decorated in the home when have central air conditioning, the equipment such as new wind, must foregone equipment, because of later period a lot of equipment need circuit, after waiting for equipment to had gone, circuit all goes OK one by one,
And many what change circuit to want to go to the lavatory than changing equipment, say to install more sophisticated equipment in front first so, later period walks along circuit to want simple a lot of.
When taking facility, must have planned the position, reduce later period to make a round trip the hidden trouble of move position, and consider equipment even from the back, furniture is the associated element such as the influence. If the equipment in the home is more, I suggest to had better look for a stylist, or so complex alternant, average owner palm does not accuse.
3, water and electricity transforms: 7 days
Water and electricity is transformed as take cover engineering, it is the arms of go ahead of the rest that decorate. Demolish and be about to begin to sail upstream report. Had better be clear about each positional pictures again construction, otherwise later period, total conference appears, insert the condition with seat improper buy.
If oneself are decorated, had better write down the switch electrical outlet in every house ahead of schedule, when be being explained to the master so, unapt forgot a few places.
Still have must consider the ground is finishing ground now, later period ground spreads ground thaw ceramic tile even, the ground is met drive up, these problems must consider.
4. Bao Li is in charge of: 2 days
Bao Li is in charge of me to suggest to be wrapped with red brick, effect of strong and durable sound insulation is not bad, hidden trouble of canal of floor slab Bao Li is too big, easy craze. And sound insulation cotton is forgotten certainly bag, sound insulation effect is apparent.
Water of 5 ground warm cent implement open casing (toilet) : 0.5 days
Water of ground warm cent implement, I suggest to install commonly in toilet, because the ground is warm,be in the ground does not have interface, the biggest slack hidden trouble is to dividing water implement place, warm the ground so minute of water implement put in toilet, in case later slack, hidden trouble is the smallest.
6. does waterproof: 5 daysDo waterproof must notice, waterproof it is to decorate medium Chongzhongzhi to weigh, want a water so mouth, the local key of floor drain nozzle is handled, in case later period is slack.
Do waterproof must affirm water of warm cent of go to the fields before implement groove has left to do not have, of the province waterproof after been do, reopen chamfer, still get again do poorly done work over again.
Do waterproof before cover the slot of water and electricity that open with cement, so waterproof effect is best.
And every are alled over waterproof among, the time that needs interval one day, cannot connect do both sides, that does not have a bit meaning.
Popularly face had better be used flexible and waterproof, prevent a building to sink, have tenacity, metope uses tigidity waterproof, rigid and waterproof, attrition muscularity, later period patch block nots allow to be dropped easily, flexible and waterproof too smooth, later period patch block is dropped easily.
7 ground are warm: 7 days
The ground is warm have needed to notice at 2 o'clock:
The span of 1. coil, it is 200mm left and right sides commonly
2. is hit approach an experiment. The change of pressure, decided leakage is not slack.
8. stiletto: 0.5 days
Water heater burning gas aperture, steam vent, flue aperture needs to hit.
9, lay a brick: 15 arrive 20 days
The need that lay a brick notices when:
1. flatness, flatness is a foundation.
Of 2. brick mix to seaming composing, reduce small
3. sky is roused, knock knock the sound that rouses for nothing.
The essence that 4. diagonal grinds an edge is fineness
5. verticality, see the verticality of shade horn, the verticality of window edge.
10. carpentry: Condole supports, TV setting wall waits a moment: 7 days
The place that the effect gives in the home should rely on carpentry greatly, and carpentry is done bad that very possible meeting guides the craze after paying is mixed be out of shape, saying to look for a good carpentry so is very important oh.
(carpentry notices detail, OK and referenced, I am mixed in the construction craft with final text check and accept standard PPT, there is detailed introduction inside. )
11, stick gesso line: 1 day
The end face of bedroom and passenger dining room and metope gesso line, after doing woodworking, can begin stickup.
Stick gesso line to have a few the dot must notice.
What 1. sticks is firm
2. diagonally essence is accurate, careful, clear.
12, whitewash the wall lacquer or person paper: 10 arrive 15 days
Whitewash the wall lacquer is the last pace that the foundation decorates. Have the place of the following attentions:
Flatness of 1. metope make level is close friends, can use rely on feet to rely on to fall. If flatness does not amount to mark, later period installs the line that play a base, chest, with switch face plate apparent.
Horn of 2. yin and yang is straight, can consider role of yin and yang, with protect part.
Paint of 3. metope wall is even, did not shed compose, show a rough draft.
13, install switch face plate and electrical outlet: 1 day
1. installs a level, level off, did not tilt, ill-natured.
2. and metope do not have aperture.
14 bury flue beforehand: 0.5 days
Although this work is small, but cannot forget, if forgot, later period as string of 1 very, reload flue, give or take a lot of trouble quite.
15 installation water heater: 1 day
15 installation are compositive condole supports: 2 days
1, keel condole must be secured very firm, secure after ending, want to undertake comprehensive examination and school are made the same score, check installation the place is proper.
2, face plate is not due bleb, remove skin, crackle, vertex damage, bilge and design to be short of the blemish such as caustic, the surface should level off, the brim should orderly, colour and lustre should agree.
16 installation ambry and put through kitchen burning gas: 1 day
(1) cupboard door installs Ying Hengping upend, switch to freely, the aperture between the door and door should be less than 4 millimeter.
(2) issues ark whole standard, touchdown is smooth, the interface of body of photograph adjacent ark did not see gap. Every ark should have leg of 4 bottoms horn, the inter wants to add L when aperture is more than 1000 millimeter or leg of 2 bottoms horn.
(Whole of 3) condole ark 4 agree to horizontal height, the interface of body of photograph adjacent ark did not see gap. Without fluctuation change, without the left and right sides concave and convex, wait for a phenomenon without ark body rock
(4) mesa should 4 to the level, the clearance that water and side of porcelain brick wall block after cannot be more than 3 millimeter, and should close with fluid sealant. After the joining together of man-made stone is in joining together to end, the station should see the mark that is less than juncture in two meters of far places.
The Wei Yu on 17 installation Weiyu and wall hangs: 1 day
(1) wholesome clean provides appearance to want to maintain clean nondestructive bad, install a part must firm, cannot become loose, otherwise need originallies closely again.
(2) drainage system wants expedite without, each join position wants sealed without leakage circumstance; Valve switch wants agile.
(3) all sorts of catharsis basins, the water of face basin wants infuse to arrive excessive water mouth, whether does the examination have leakage problem
Floor of 18 installation wood: 2 days
Press wooden floor, notice the ground is protected, avoid later period cut. See the flatness that next wooden floors install again, and have cock, metabolic place.
19 installation chest and metope decorate: 2 days
Install detail: Hardware is accurate, cupboard door aperture is consistent and even. On any account is consistent.
Detail processing: For instance sealing side, screw, press moustache meticulous, beautiful.
Frame is firm, the verticality that checks chest is perpendicular, ground plane whether level off
20 installation door and the line that play a base: 2 days
The door covers 3 level off perpendicular, diagonally and careful, level off. Door core is perpendicular, push-pull of page of carry on one's shoulder is smooth, lock switch is fluent, ground of door core distance is controlled 0.5 centimeters.
21 installation lamps and lanterns: 2 days
22 installation curtain: 2 days
23 hang picture and metope. 1 day
24 furniture home appliance is put (decorate an end) .
Come down basically to need 70 days to influence time entirely, if have equipment to be in 90 days or so, above is the decorates about the family detailed flow that I sum up and note, hope to be helped somewhat to everybody.
I summed up a detailed construction recently craft and check and accept standard Ppt, inside everybody is OK very clear see inside the detailed construction craft of each working procedure and check and accept a standard.
Solved everybody decorating a process in the center, do not know craft, do not know how acceptable pain spot, if everybody has intention, can leave a message below or illicit letter I.
Above is the partial content of Ppt, come down to have 120 much pages entirely, very common, simple palpability.
Everybody is good, I am the stylist that having experience of 10 years of designs, if everybody feels the text that I release is helped somewhat to everybody, the head that can pay close attention to me date, I can release useful domestic Ju Wenzhang regularly.