Should domestic outfit flow be what kind of?

Always wanting to hold the home into favorite look is the wish of a lot of owner, do not wish to miss really to each measure that decorate. If will much energy puts costume is in the home,be designed and advocate of material buy on, oversight reasonable to decorating a process to do timeline. If time is adjusted come nevertheless, delay period of delay one's work already, bring needless expense again.

The flow that decorate, can saying is complex trival. Most be afraid of not careful affect whole decorate the effect, hep building decorates flow also unapt hurry-scurry.

Can how you know professional building work flow chart is? Build gentleman to think to write down a building to decorate the point of flow chart sincerely, the home holds time ability is not confused.

Make the exercise flow chart with detailed house, understand?

It is so easy that the about of the home in making ideal always is done not have, of the process endless can use up a lot of mental efforts probably. Make the executive move with strict on construction segment house above 24 link, the rigorous, science of each construction segment, professional, bring up final perfect appear, all investment are worth while.

1

Pre-construction phase

When beginning to prepare to decorate, when be without main threads of an affair, the tiring-room of date of small letter public that can reside through building first perhaps makes an appointment on APP sign up, will stylist comes spot survey, give detailed program to make to owner, solve owner decorate trouble. After design plan emerges if intent can pay,make an appointment deposit 5000 yuan, stylist begins to give effect graph scale later.

Build the stylist of house all the time advocate style of the Europe that hit north and contemporary and contracted style, outstanding stylist is OK make each when suit owner decorate a style, design you finally to always be met satisfactory.

Owner decided after decorating a design, need make choice of advocate material, begin to run building materials market, traditional pattern is very painstaking for certain. And build of house one-stop service, cooperate with business of about a hundred of home well-known trademark, strong strong together, you want here has.

2

Body of the wall that tear open build by laying bricks or stones + advocate material, water and electricity plans stage

Enter construction segment, main body is torn open changing is most a project that goes up first, basically include to tear open skin of wall of wall, build by laying bricks or stones, shovel wall, tear open window of the central heating, steel that change model to wait. Wall system is built after demolish, begin fixed position of water and electricity next.

Fixed position of water and electricity should decide socket, faucet, closestool, floor drain finally, crouch, the position of shower partition, washing machine, air conditioning.

3

Water and electricity is transformed

Water and electricity is transformed is one of the most important take cover engineering in decorating. After water and electricity changes, some construction just can cheat owner in this link, do not hit pressure with respect to hand over a completed project. But give on this link go to house do not need give a lot of care, can undertake conduit is hit press and electrical wiring checks ability hand over a completed project, having strict executive level.

Basically include:

After ① sees the position of lampblack machine electrical outlet whether be affected the installation of lampblack machine;

The place that ② visits water meter is proper;

After whether the position of water mouth facilitates, ③ settle on installs cistern.

4

Phase of project of waterproof, mud and carpentry phase

Next construction project is OK alternate construction, do waterproof moment to be able to undertake wood makes construction at the same time. Patch block applies man-hour to be able to undertake metope construction. Complex wood makes need decide ahead of schedule modelling and material, wood makes level very the craft of test carpentry master.

5

Metope phase

Metope working procedure is perforative of whole construction process, time of time limit for a project is longer, also meet among across has other item. Painter enters the arena, the processing of basic level of the main metope that finish, lacquer that brush a face, and the job such as the lacquer on a few wooden furniture, if need paper, need to let oily labour do basic level processing in the metope that plans paper only. When carpentry, bricklaying, painter, after finishing, "Construction segment " finish basically, make one's bow installs link.

6

Final installation phase

Installation is the final phase that decorate, also be the trivallest phase. One pile installation can emerge and come, baobuqi dropped 9 model with respect to leakage.

Basically include: Hutch defends installation of door of condole top, wood, floor installation, furniture installation and kitchen utensils and appliances Wei Yuan outfit.

After installation, home appliance should enter the arena enter the arena, the installation of this installation.

7

Soft outfit is tie-in

Household deserves to act the role of, the last stage that the home holds, the home is installed already by is decorated turn be adornment, the installation that includes a curtain belongs to household to distribute circlet part.

Household deserves to act the role of still include to be able to consider to buy handicraft of a few greenery, picture that hang a wall, decoration wait... anyhow, free play, it is good to like. (if him choice is bad, go to reside the soft outfit stylist that has major, can make reasonable soft outfit collocation according to need. )

Person of a lot of moment is perceptual, but living is reason however. When undertaking planning afresh to the home, you always should are opposite decorate flow be clear at the bosom, diversify happens and do not not know oneself.