After present owner buys a house, hope to have a good project quality. However because be seller's market, although discovered a problem, solve rise also difficulty is quite great.
However, although have difficulty, but as owner, should acceptable the project still wants acceptable, cannot appear at least more serious structure problem or quality problem.
So, when making a room, details of what building construction, construction should check normally?
1, affirmatory building area
This measure more easily, oneself can be finished with rice feet. Him floor area is very difficult toilet, but cover inside area, oneself can be measured come out. In case little a square, with respect to combination upstairs and downstair neighbour is checked together.
2, check the area
The ground does not have the empty beat of 400cm2 above, the surface is not had case arenaceous, have the appearance such as skin, break, ground flatness accords with local requirement.
3, check metope
Check metope whether level off while, still need to see metope whether have crack, compare serious flaw especially, should make clear Hunan is the problem of the problem that builds a structure or facing, build structural problem, arrive if if solve,decorating level, price is higher. 4, inspection door window
Above all the orbit of inspection door window is smooth, this is easier, whether inspection door pane has damaged or be out of shape namely next, if have indoor door, it is good to also want scrutiny.
5, the examination enters a gate
Above all whether does inspection door have knock against and brush paint, the installation of the door is clingy doorcase, is solid, the key is good with wait.
6, check the balcony
The area that visits the balcony above all whether level off, the window that is the balcony next and glass are in good condition, especially window hardware good with.
7, examination layer is tall
According to relevant provision, building layer is 2.8 meters high, actual height cannot under 2.6 meters, the layer is tall the 3 actual height of rice cannot under 2.75 meters, residential layer is tall cannot under 2.8 meters.
8, check water supply
One by one opens faucet, treat water supply condition, the faucet in including the conduit well in corridor also should try, see whether normal water supply.
9, inspect drain off water
Proposal test house when, take a large mineral water bottle, undertake checking to each outfall, try catchment speed, additional, the floor drain position of toilet also should undertake checking, looking is opposite nadir.
10, examination obligate mouth of a cave
If develop business already obligate became good air conditioning aperture, when checking, should look whether in tall outside low, ensure rainwater won't rinse comes.
11, check circuit
Circuit includes strong report and weak report two parts:
When strong report is checked, each sky that sees distribution case first leaves whether regular job, next reexamination the switch face plate of every room is normal, especially whether does the power source electrical outlet near mouth of the water supply inside toilet have prevent splash measure;
Weak report is checked, basically be eaves seeing a building normal to telling, it is normal to see the reticle inside weak report box again laid, additional, want to see weak report box have power source electrical outlet.
12, the examination is waterproof
Owner is OK will enter the water the mouth stems, open the faucet of toilet next, oneself undertake so called " the experiment that shut water " , after 48 hours, look to downstair neighbour home slack.
If the problem above puts the word that be in, it is OK to communicate deadline to correct with open trade.
Above is beautiful mew net small the semifinished product room that books summary checks and accept 12 attentions dot, still have the detail of house of a lot of test of course, if owner fears the house appears really the word of major flaw, the proposal chooses professional test house division to come to serve. But beautiful mew network is small write a proposal, if not be particularly serious structure problem, want to decorate sooner or later anyway, might as well give a few small flaws decorate a company to solve, lest wastes time, after all, time is money.
If feel the article has a few reasons, with respect to fatigue irritated for beautiful mew net small make up nod an assist to be encouraged in order to show; If feel the opinion fails to meet each other, the welcome publishs a comment; Finally, achieve formerly not easy, the person that borrowed please carries high please expensive hand. Thank!